Projects
M/V Misje Swami: Main Switchboard Replacement
23 October 2026
Following a fire onboard M/V Misje Swami, ATOZ carried out the complete replacement of the vessel’s main switchboard. The main switchboard is a central…
Read more
M/V Ambition: Dry-dock Repairs
23 October 2026
ATOZ’s riding squad carried out steel replacement, piping and interior works during the dry-docking of M/V Ambition. The assignment brought together several repair disciplines…
Read more
M/V Optima: Fan Installation
28 September 2026
ATOZ carried out fan installation works onboard M/V Optima for Alpha Shipping Company. Adding equipment to an existing vessel requires attention to the available…
Read more
Ballast Water Treatment System Projects
28 September 2026
ATOZ carried out ballast water treatment system projects covering technical design, prefabrication and installation. The assignments took place in Riga and abroad during 2022–2023.…
Read more
M/V Orient U: Equipment Retrofit and Steel Renewal
28 September 2026
ATOZ’s riding squad carried out a combined equipment retrofit and steel renewal assignment onboard M/V Orient U. The project included a ballast water treatment…
Read more